Ilgazlar Group

Completed Projects »


DESCRIPTION : On the ring road at the same time will make the input-output capacity of 100 buses carried Intercity Bus Terminal integrated with contemporary architecture of public buildings as one of the finest examples serve our people. Technical Specifications 160 acres of land, 15,000 m2 construction area, 9 month construction period (80,000 workers / day), 37 shops, 48 ticket booths, 50-office, restaurant patisserie, 2 çayocag, the coffee shop, mosque, post office, two ATMs, six independent, section 52 buses, 52 bus bay,, 2500m2 passenger waiting hall, 35,000 m2 of car parking space 1,400 tons of iron, 20,500 m3 of concrete, 68,000 m2 formwork, 4,350 m2 of space systems steel roof, 2,250 m2 of imported granite cladding, 4,800 m2 of imported solid laminate (Trespa ) siding, 7,250 m2 of granite flooring, 3,000 m2 of granite-patterned special plaque floor covering 8,000 m2, suspended ceiling, 6,000 m2 of heat and water insulation, 3,500 m2 of glass, 48 units imported MPQF laminate (Trespa) ticket offices, 72-unit imported solid laminate (Trespa) toilet units, 14 units photocell, automatic door, 4 passenger routing electronic board, air conditioning and heating in each section.

copyright © 2014 | Ilgazlar Grup | Design By ASD Web Tasarım